Rollout process

Following the adoption of the 2024 RSPO Principles and Criteria and the 2024 RSPO Independent Smallholder Standard at the 21st RSPO General Assembly on 13 November 2024, the revised 2024 RSPO Standards were initially scheduled to take effect 12 months after adoption (13 November 2025).

Following the approval of Resolution GA22-2d at the 22nd RSPO General Assembly (GA22), the RSPO P&C Standard will take effect on 31 May 2026. This resolution does not affect the RSPO ISH Standard, which remains effective on 13 November 2025.

For any questions on the 2024 Standards Rollout and Implementation, or to provide any feedback, suggestions, recommendations or issues regarding the revised 2024 RSPO Standards or revised RSPO Certification Systems for the P&C  and RSPO ISH Standard, please email [email protected]

To register any concerns or complaints regarding the development and maintenance of RSPO Standards, please email: [email protected]

*Click titles in orange to jump to associated topics

Supplementary/Derivative Documents | Socialisation | Trainings

Supplementary/Derivative Documents

To support the implementation of, and compliance with, the RSPO Standards, RSPO has developed a library of supplementary and derivatives documents that support general or specific aspects/criteria/indicators of the RSPO Principles and Criteria (P&C) and the RSPO Independent Smallholder (ISH) Standard. 

The following is a list of existing or new supplementary/derivative documents of the 2024 RSPO P&C and the 2024 RSPO ISH Standard that are currently effective, are to be updated/developed, or are in active development. The status of each document is as of 13 November 2024. This list shall be updated regularly to denote the latest status of each document. 

RSPO aims to complete the development of as many of these documents as possible, for endorsement by the RSPO Standards Standing Committee (SSC) and for implementation by members, within the 12-month period prior to the 2024 RSPO Standards becoming effective. In the event that a supplementary/derivative document is not able to be developed within the 12-month period, RSPO shall indicate an expected completion date in this list and, if necessary, initiate the development of an Interim Measure to support compliance. 

List of supplementary/derivative documents of the 2024 RSPO Principles and Criteria

Document Status Progress
RSPO Certification Systems for Principles and Criteria (P&C) and Independent Smallholder (ISH) Standard  Completed The SSC has endorsed the CSD on the 14th of November 2025. CSD (including translations) has been uploaded to the website.
RSPO Human Rights Due Diligence (HRDD) Guidance  In development The SSC has been informed on the approval by HRWG of HRDD Draft Guidance for Public Consultations and Field Testings. The document is currently in translation to Bahasa Indonesia and Spanish.
Annex 4 – List of RSPO-recognised Human Rights Due Diligence methodologies for compliance to Indicator 1.3.1 In development The SSC has endorsed Annex 4 and the list will be updated in the latest P&C 2024.
RSPO Policy on the Protection of Human Rights Defenders, Whistleblowers, Complainants and Community Spokespersons  To be updated Ongoing revision of the current RSPO Policy on the Protection of Human Rights Defenders, Whistleblowers, Complainants and Community Spokespersons 2018.
RSPO Prevailing Wage Calculation Procedure In development The PWCP is currently open for public consultation from 23 February to 15 April 2026. Field trials are taking place concurrently, and both are expected to conclude on 15 April 2026.
RSPO Guidance on Calculating Prevailing Wages Effective*
Free, Prior and Informed Consent (FPIC) Guide Effective*
Guidance on Child Rights for Palm Oil Producers Effective*
RSPO Practical Guidance on Gender Inclusion and Compliance to the 2018 P&C and 2019 ISH Standard Effective*
Guidance for the Repayment of Recruitment Fees and Related Costs In development The document is currently undergoing public consultation via the Conveio platform, alongside a 60-day field testing period. A webinar has been conducted to support stakeholder engagement. Finalisation is targeted for October 2026, subject to feedback received.
Guidance on Peat Inventory for RSPO Reporting In development To be updated under the RSPO Biodiversity and High Conservation Value Working Group (BHVCWG). The aim is to consolidate into a single, comprehensive document (Guidance and Template); and integrate/ align its content with the UPAR. The document is currently pending discussion on endorsement pathways and procedural next steps.
RSPO Peat Inventory Template In development To be updated under the RSPO Biodiversity and High Conservation Value Working Group (BHVCWG). The aim is to consolidate into a single, comprehensive document (Guidance and Template); and integrate/ align its content with the UPAR. The document is currently pending discussion on endorsement pathways and procedural next steps
RSPO Drainability Assessment Procedure  In development To be updated under the RSPO Biodiversity and High Conservation Value Working Group (BHVCWG). The document is currently pending discussion on endorsement pathways and procedural next steps.
PalmGHG Calculator Manual In development The public consultation comments have been reviewed and deliberated at the 9th GHGTF meeting. Version 6, incorporating the decisions from the 9th GHGTF meeting, is being reviewed by GHGTF.
GHG Assessment Procedure for New Development In development The drafts (guidance and excel tool) for growers post GHGTF meeting are being reviewed by GHGTF meeting for finalisation.
Simplified GHG Assessment Procedure for New Development (Reference Tool for Smallholders) In development The drafts (guidance and excel tool) for smallholders post GHGTF meeting are being reviewed by GHGTF for finalisation.
RSPO Guidance for Land Use Change Analysis (LUCA) To be updated To be updated under the RSPO BHVCWG. Part of RaCP.
Interpretation of Indicator 7.7.1 (C) In development Based on Annex 5 of the 2018 RSPO P&C, to be updated for validity, under the RSPO BHVCWG. The subsequent joint development of the combined document will be executed through collaboration between the BHCVWG and HCVN, pending follow-up/alignment with HCVN representative.
Remediation and Compensation Procedure (RaCP) To be updated RaCP v2, to be updated under the RSPO BHVCWG. A workshop has been conducted in April 2025. Further discussions with CTF2/BHCVWG on next steps.
RSPO Peat Audit Guidance To be updated To be updated under the RSPO BHCWG. The document is currently in the final drafting and internal review phase.
RSPO Manual on BMPs for Management and Rehabilitation of Peatlands Effective*
RSPO Manual on BMPs for Existing Oil Palm Cultivation on Peat Effective*
RSPO Manual on BMPs for the Management and Rehabilitation of Riparian Reserves Effective*
RSPO Drainability Assessment Submission Checklist To be updated To be updated under the RSPO BHVCWG
RSPO Fire Report Form To be updated To be updated (RSPO Secretariat)
RSPO List of Hazardous Pesticides (ref: Indicator 7.1.2) In development To be updated (RSPO Secretariat). The demo of the automatic list is ready. The list from WHO 1a and 1b have been included. The RSPO Secretariat will continue to include a list of pesticides from country level.
Pesticide Usage Record Template In development To be developed (RSPO Secretariat). To be developed after the List of Hazardous Pesticides supporting document is completed.
Drainability Assessment Procedure Levelling Template To be updated To be updated under the RSPO BHVCWG
List of Allometric Equations for Different Vegetation Types and Regions To be updated Review completed with GHGTF at the 6th Meeting- only focusing on GHG-related. This document is no longer relevant. Minor amendment, no public consultation required.
RSPO List of Invasive Species (ref: Indicator 7.1.6 and 7.1.7) In development To be updated under the RSPO BHVCWG. The RSPO Secretariat has reviewed all materials for this document.
RSPO Manual on Best Management Practices (BMPs) for Steep Terrain Conservation and Management In development To be finalised under the RSPO BHCVWG. The final draft is ready. Finalisation will include the alignment from the BMP on Soil and RaCP V2.
RSPO Best Management Practices (BMPs) for Soil In development The RSPO Secretariat has presented the outline and discussed it with BHCVWG, and will incorporate the feedback received into the overall outline and timeline. This will be further discussed with the BHCVWG in the next meeting.
RSPO Guidance on Changes in HCV Conditions and Status In development NEW. The outline of the guidance has been discussed at the BHCVWG. The document will be integrated with the HCV-HCS Management & Monitoring (M&M) Plan Guidance.
The subsequent joint development of the combined document will be executed through collaboration between the BHCVWG and HCVN, pending follow-up/alignment with HCVN representative.
Guide on High Carbon Stock Approach Requirements for the RSPO Effective*
Compilation of BMPs to Reduce Total Emissions from Palm Oil Production Effective*
Guidance on Map Submission for Land Use Change Analysis (LUCA) for Independent Smallholders In development The RSPO Secretariat is reviewing the LUCA for smallholders. This will be prepared as part of the Annex of the RaCP for Smallholders.
High Forest Cover Countries (HFCC) Procedure To be developed To be developed by the RSPO BHCVWG at a later stage.
RSPO New Planting Procedure (NPP)  In development Minor changes are added in the revised draft before proceeding for public consultation.
RSPO Management System Requirements and Guidance for Group Certification of FFB Production Effective* Note: This document may be revised as part of the upcoming SCC Standard revision
RSPO Supply Chain Certification (SCC) Standard In development Draft 1.0 of the revised SCC Standard is open for Public Consultation 1 from 16 March 2026 until 14 May 2026. Webinars are organised during the public consultation period to inform the participants of the key changes in Draft 1.0.
RSPO Rules on Market Communications and Claims Effective*

* Documents listed with an Effective status are currently endorsed supplementary/derivative documents supporting the 2018 RSPO P&C that remain valid for the implementation/compliance of the 2024 RSPO P&C. However, these documents may undergo a minor, non-substantive update to align its content e.g., with revised numbering or references of the 2024 RSPO P&C. 

 

List of supplementary/derivative documents of 2024 RSPO Independent Smallholder Standard 

Document Status Progress
Minimum required Best Management Practices (BMPs) for Independent Smallholders To be developed NEW. To be developed by the RSPO Smallholder Standing Committee (SHSC)
RSPO Simplified Guide on Free, Prior, and Informed Consent for Independent Smallholders In development To be finalised by the RSPO HRWG
Guidance on Child Rights for Smallholders and Group Managers Effective*
Guidance Document on the Simplified High Conservation Value (HCV) Approach for Smallholders in the RSPO – Introduction Document (Phases 1 and 2) In development To be updated under the RSPO BHCVWG. Minor change, Secretariat to take this on.
Guidance Document for Smallholders on Managing High Conservation Values (HCVs) in Established Oil Palm Plantations – Existing Plantings (Phases 3 and 4) In development To be updated under the RSPO BHCVWG. Minor change, Secretariat to take this on. Currently in internal review phase.
Guidance Document on the Simplified High Conservation Value (HCV) Approach for Smallholders in the RSPO – HCV Procedures for New Plantings (Phases 3 and 4) In development To be updated under the RSPO BHCVWG. Minor change, Secretariat to take this on. Currently in internal review phase.
Guidance for ISH Group Manager Independent Smallholder – Land Use Risk Identification (IS-LURI) In development To be updated under the Smallholder Standing Committee (SHSC) and later the SSC via Decision Paper. This document was approved for endorsement by SHSC and is awaiting discussion and approval at the next ASC meeting.
Forest Protection Approach (FPA) To be developed The development of this document is deferred until the IS-LURI document has been finalised and officially endorsed.
RSPO Remediation and Compensation Procedure (RaCP) process for smallholders To be updated RaCP v2, to be developed under the RSPO BHVCWG and CTF2
RSPO Smallholder Best Management Practices Manual for Existing Oil Palm Cultivation on Peat Effective*
RSPO ISH Flood Risk Assessment Template Effective*
Simplified Guide Management and Rehabilitation of Riparian Reserves Effective*
RSPO ISH Dispute Disclosure Form Template Effective*
Guidance for RSPO ISH Dispute Disclosure Form Template Effective*

* Documents listed with an Effective status are currently endorsed supplementary/derivative documents supporting the 2019 RSPO ISH Standard that remain valid for the implementation/compliance of the 2024 RSPO ISH Standard. However, these documents may undergo a minor, non-substantive update to align content e.g., with revised numbering or references of the 2024 RSPO ISH Standard.

 

Socialisation of revised Standards

To support RSPO Members and accredited Certification Bodies in preparing for implementation of, and compliance with, the 2024 RSPO Principles and Criteria and the 2024 RSPO Independent Smallholder Standard, RSPO is planning continuous engagement activities (physical and virtual) in 2025 and beyond for members and auditors, to socialise the changes and requirements of the 2024 RSPO Standards.

RSPO will be publishing a list of confirmed engagement activities (including CB Forums, RSPO events, etc.) once an initial calendar for 2025 has been developed and confirmed. The calendar will be regularly updated. 

Country Date Medium Activities
Indonesia 18 March 2025 Physical Collaborated with RSPO member socialising on Principle 6 of 2024 RSPO P&C Standard
Indonesia 16 January 2025 Physical 2024 RSPO ISH Standard Socialization
Thailand 2 July 2025 Physical RSPO P&C 2024 Socialisation/Update
Thailand 30 January 2025 Physical 2024 RSPO ISH Standard Introduction to Stakeholders
Ghana 8-10 April 2025 Physical P&C and ISH 2024 Standards Roadshow
Cameroon 24-27 March 2025 Physical P&C and ISH 2024 Standards Roadshow
Cameroon 3-5 February 2025 Physical Smallholder Group Training
Gabon 18-21 March 2025 Physical P&C and ISH 2024 Standards Roadshow
Guatemala 24 January 2025 Online 2024 RSPO P&C Standard training focused on Principle 7
Colombia 12 December 2024 Physical Meetings with P&C Accredited Certification Bodies
Mexico 11 June 2025 Physical RSPO ISH 2024 Socialisation
Mexico 10 June 2025 Physical RSPO P&C 2024 Socialisation
Colombia 24 February 2026 Physical RSPO P&C & ISH 2024 Standard Socialisation
Guatemala 26 February 2026 Physical RSPO P&C & ISH 2024 Standard Socialisation

 

Training

RSPO is developing the RSPO Learning Centre and updating the training curriculum to reflect the requirements of the revised 2024 RSPO Standards and the revised Certification Systems document. More information will be made available and regularly updated in this section, once timelines and processes have been finalised.

RSPO Learning Centre Launch

Activities Date
RSPO ISH 2024 Online Training Module 31 July 2025
RSPO P&C 2024 Online Training Module 30 September 2025
RSPO Endorsed Training Provider (ETP) Procedure Development 31 March 2025
RSPO P&C 2024 Train the Trainer Programme
Medan and Simalungun, Indonesia (South East Asia) 24–28 November 2025
Bucaramanga and San Alberto, Colombia (Latin America) 9–13 December 2025
RSPO ISH 2024 Train the Trainer Programme
RSPO Office, Kuala Lumpur, Malaysia (South East Asia) 24–26 September 2025
Bogota, Colombia (Latin America) 3–5 December 2025